Premium activewear. Built for performance.
Made for your brand.
MOQ
100 PCS
Samples
7–10 Days
Bulk
25–35 Days
Manufacturing
OEM / ODM
| Style | Fit | Best For | Key Feature |
|---|---|---|---|
| Performance Shirts | Athletic | Training / Gym | Moisture-wicking |
| Training T-Shirts | Regular | Daily Training | Soft & Breathable |
| Running Shirts | Athletic | Running | Lightweight |
| Compression Shirts | Compression | Performance | Muscle Support |
| Seamless Tops | Body Fit | Training / Yoga | Seamless Knit |
| Cropped Tops | Slim | Lifestyle / Gym | Modern Fit |
| Oversized T-Shirts | Loose | Lifestyle | Relaxed Fit |
| Polo Shirts | Regular | Team / Corporate | Smart Casual |
Polyester Spandex
4-Way Stretch
Mesh
Breathable & Lightweight
Cotton Jersey
Soft & Comfortable
Nylon Spandex
Smooth & Durable
OEM Manufacturing
Your designs, our production.
High-quality manufacturing
with full process control.
ODM Solutions
From concept to product.
Complete product development
and design support.
Private Label
Build your brand.
Custom labels, tags and
packaging solutions.
1
Design
2
Fabric
3
Sample
4
Production
5
QC
6
Delivery
15+
Years
3,000㎡
Factory
100+
Workers
1,000
PCS / Day
to Production
What is your minimum order quantity?
Our standard MOQ is 100 pieces per color and style. Different sizes can be mixed within the same order.
How long does sampling take?
Sample development normally takes 7–10 days after the fabric, measurements and design details have been confirmed.
What customization options do you offer?
We support custom fabrics, colors, sizing, garment fits, printing, embroidery, labels, hang tags and private label packaging.
What is your production lead time?
Bulk production normally takes 25–35 days after sample approval. The exact lead time depends on the order quantity and customization requirements.
Do you provide fabric development?
Yes. We can help select or develop fabrics based on your required composition, GSM, stretch, texture, color and performance features.
How do you ensure product quality?
We use a three-stage quality control process covering fabric inspection, in-line production inspection and final garment inspection before shipment.